Camuglia Street - Design Iteration 4

The fourth and final design iteration for the Camuglia Street PCS (pollution control system). Final design incorporates combined primary sedimentation basins and gross pollution traps. The basins are below creek level and hence designed to be flooded and remain in place despite the effects of groundwater hydraulics.