Camuglia Street - Design Iteration 2

The second design iteration which attempts to deal with both stormwater drainage pipes in a combined primary sediment basin. This design failed due to concerns with ongoing maintenance, system flooding and the difficulty of incorporating gross pollutant trapping and safety requirements.